Skip to main content
Jyot Enterprise

Engineering Services

Industrial Automation

PLC, SCADA and machine data that reaches the office.

Overview

Automation and control system integration — PLC programming, HMI and SCADA development, VFD and drive integration, plus OEE and production data flowing from the shop floor into your ERP instead of dying on a display.

Timeline

4–14 weeks depending on IO count

Engagement

Quoted after a free scoping call

Includes

A named specialist owning your file end to end

Benefits

What you actually get.

Vendor agnostic

Siemens, Allen-Bradley, Delta and Mitsubishi platforms.

Visible data

OEE, downtime and production counts reported automatically.

ERP connected

Shop-floor data written into your business system.

Documented code

Commented programs and IO lists so you are not locked in.

Process

How the engagement runs.

Typical duration: 4–14 weeks depending on IO count.

01

Study

Process, IO and control requirements documented.

02

Design

Control architecture, panel design and IO schedule.

03

Development

PLC, HMI and SCADA built and simulated offline.

04

Commissioning

On-site loop checks, tuning, training and handover.

For the first time we know our real OEE instead of arguing about it.

Nilesh Chauhan · Production Head

Frequently asked

Related services

More from our engineering practice.

Enquire about Industrial Automation

Free consultation. Written scope within three working days.

We reply within one working day. Your details are used only to respond to this enquiry.