Assembly fixture redesign and plant layout

A legacy fixture causing tolerance drift was redesigned from the ground up, lifting line throughput by 22%.

Client
Arva Industries
Timeline
11 weeks
Delivered
2024
Arva Industries — featured overview

Business challenge

An undocumented assembly fixture was producing inconsistent tolerances and capping line throughput. The original designer had retired and no drawings existed.

Solution

The existing fixture was reverse engineered, then redesigned in SolidWorks with FEA validation, a revised clamping scheme and correct GD&T. Plant layout around the cell was reworked to remove two material-handling steps.

Business result

Cycle time dropped 22% and rejection at final inspection fell by two-thirds. The full drawing set, GD&T scheme and inspection plan are now documented and revision controlled.

22%

Cycle-time reduction

-67%

Final inspection rejects

2.9x

First-year return

100%

Documented and controlled

Technologies:SolidWorksFEAAutoCADGD&T3D Scanning

Gallery

Screens and deliverables.

Fixture assembly model
FEA stress plot
Revised cell layout
The documentation alone was worth the engagement.
Pranav DesaiPlant Head · Arva IndustriesEngineering

Similar problem?

We have solved this shape of problem before.

Tell us where your operation leaks time or cash and we will scope what it takes to fix it.